Stay informed -- follow the blog!

Batch 1 Harris (Block no.1)

PavløvA_YT

Here is the Block to go with Unit no.20!

Arrange as 501M-601T-602T-502M

When running with Unit no.20, arrange as 520M-620T-520BT-501M-601T-602T-502T.

B1 should take about 1hr to build, U20 should take about 45 minutes to build 

501T
502T
601T
602T

No comments:

Post a Comment