Stay informed -- follow the blog!

Crimson VB2N

PavløvA_YT

The long-awaited Crimson VB2N is finally done! This 7-car consist is composed of one driving trailer, one trailer with bike space and a toilet, one carriage with no toilet, or bike space, one carriage with a toilet, one low-floor carriage with a wheelchair accessible toilet (PMR), one low-floor carriage with bike space and a wheelchair accessible toilet (PMR-V), and one carriage which couples to a locomotive.

In a little "twist" -- all carriages have air conditioning!

R7
R6
R5
R4
R3
R2
R1
P2 and P3 might need new bogies...

5 comments:

  1. Can you learn me how do the crimson livery ?

    ReplyDelete
    Replies
    1. I will tell you in one week, for now, I have taken an oath not to make trains, and to focus on my upcoming trial Engineering exam. I will publish a video tutorial soon...

      Delete
  2. Replies
    1. https://www.youtube.com/@CrimsonEole

      Delete